Skip to content

Infrastructure

Two works in Pune’s industrial belt.

Manufacturing is split between Unit 1 at Talawade and Unit 2 at MIDC Chakan, with the forging facility and NDT facility supporting both.

Request a quotation →
Fabrication workshop with pipe spools (representative image)
Representative industrial image — not Sankalp Engineers’ own facility.

Unit 1 — Talawade

UNIT 1

Gat No. 65, Plot No. 2, Shelar Wasti, Talawade, Pune – 411062, Maharashtra, India

Open in Google Maps

Unit 2 — Chakan

UNIT 2

Plot No. PAP-B-65, MIDC, Chakan Industrial Area, Phase 2, Tal. Khed, Pune – 410501, Maharashtra, India

Open in Google Maps

Works visits and approval audits can be arranged. Please fix a time in advance.

Inside the works

Facilities that stay under one roof.

Unit 1 — Talawade

Gat No. 65, Plot No. 2, Shelar Wasti, Talawade, Pune 411062. Unit 1 sits in the Talawade industrial area north-west of Pune, within reach of the Mumbai–Pune expressway and the Chakan belt.

Unit 2 — MIDC Chakan

Plot No. PAP-B-65, MIDC, Chakan Industrial Area, Phase 2, Tal. Khed, Pune 410501. Chakan carries the larger fabrication work, including steam headers and long pipe spools.

Works and inspection facilities

  • Fabrication bays for headers and pipe spools up to 1200 mm (48" NB)
  • Forging facility for flange and fitting blanks
  • Machining of flange faces, bolt circles, plates and throats
  • Self-equipped NDT facility for our products
  • Inspection and dispatch from both units

A plant and machinery list, with capacity figures, is issued with the technical bid for a specific enquiry. It is not published here because machine loading changes with the order book.

Request a quotation

Ready to put a drawing on the table?

Send the line size, pressure class, material grade and quantity. We reply within one working day.

View this page as

Machine-readable page

/infrastructure.md

Open raw

The Markdown source of this exact page, generated from the same content as the website.

Loading Markdown…